PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Aligning the stone panels at the 2nd floor North Elevation.jpg Copper piping at the 2nd floor bathroom sinks Facing South.jpg Ductwork raiser at the 3rd floor Facing South-East.jpg Installed copper piping at the 3rd floor bathroom Facing North.jpg Installed copper piping at the 3rd floor Facing West.jpg Installed metal decking at Stair -3 4th Floor Facing North.jpg Weather strips at the curtain wall South elevation.jpg Erecting stone panels at the North Elevation.jpg
Previous pageNext page Installed copper piping at the 3rd floor Facing West
Installed copper piping at the 3rd floor Facing West